Challenge:
To rapidly deploy a self-contained camp for 1,000 personnel in a remote desert with extreme aridity and temperature swings, requiring a 25-year design life for all facilities.
Our Solutions:
As a deep ODM partner, we led the modular layout planning, selection of wind-resistant and high-insulation materials, and internal circulation design. All modules were pre-fitted with heavy-duty HVAC systems and delivered in phased, just-in-time logistics for on-site assembly, achieving full completion in 4 months.