Mining Camp Accommodation for 1,000 Personnel
Challenge:
To rapidly deploy a self-contained camp for 1,000 personnel in a remote desert with extreme aridity and temperature swings, requiring a 25-year design life for all facilities.
Our Solutions:
As a deep ODM partner, we led the modular layout planning, selection of wind-resistant and high-insulation materials, and internal circulation design. All modules were pre-fitted with heavy-duty HVAC systems and delivered in phased, just-in-time logistics for on-site assembly, achieving full completion in 4 months.
Total Project Duration
8-10 months (Batch design and production,continuous sea freight, on-site parallel assembly)
Clients
Global resources group
Western Australia
Government & Institutions
$12M – $15M+
(Note: Actual budget and timeline vary based on specific requirements, configurations, and market conditions at the time. This data is for reference only.)

OUR Core Value
For Corporate Clients:
- Complex system solutions
- product reliability in extreme environments
- large-scale project management
Proof of Capability:
Our product durability meets the world’s most stringent industrial standards.


Our modules are manufactured here.

