CamphorTree Prefab

Desert Mining Camp Accommodation for 1,000 Personnel

Mining Camp Accommodation for 1,000 Personnel

Challenge:

To rapidly deploy a self-contained camp for 1,000 personnel in a remote desert with extreme aridity and temperature swings, requiring a 25-year design life for all facilities.

Our Solutions:

As a deep ODM partner, we led the modular layout planning, selection of wind-resistant and high-insulation materials, and internal circulation design. All modules were pre-fitted with heavy-duty HVAC systems and delivered in phased, just-in-time logistics for on-site assembly, achieving full completion in 4 months.

Total Project Duration

8-10 months (Batch design and production,continuous sea freight, on-site parallel assembly)

Clients

Global resources group

Location

Western Australia

Category

Government & Institutions

Budget

$12M – $15M+

(Note: Actual budget and timeline vary based on specific requirements, configurations, and market conditions at the time. This data is for reference only.)

OUR Core Value

For Corporate Clients:

Proof of Capability:

Our product durability meets the world’s most stringent industrial standards.

Our modules are manufactured here.

Shopping cart close

CamphorTree Prefab

No. 201, Building 22, Baiqiang Auto Commercial Plaza, 555 Zhongshan South Road, Songling Town, Wujiang District, Suzhou City, China

Customer Service Hours

Mon – Fri: 8am-6pm

Sat -Sun: Close

© 2026 Camphortree Prefab . All Rights Reserved.