Industras

Desert Mining Camp for 1,000 Personnel

Desert Mining Camp for 1,000 Personnel

Challenge:

To rapidly deploy a self-contained camp for 1,000 personnel in a remote desert with extreme aridity and temperature swings, requiring a 25-year design life for all facilities.

Our Solutions:

As a deep ODM partner, we led the modular layout planning, selection of wind-resistant and high-insulation materials, and internal circulation design. All modules were pre-fitted with heavy-duty HVAC systems and delivered in phased, just-in-time logistics for on-site assembly, achieving full completion in 4 months.

Total Project Duration

8-10 months (Batch design and production,continuous sea freight, on-site parallel assembly)

Clients

Global resources group

Location

Western Australia

Category

Government & Institutions

Budget

$12M – $15M+

(Note: Actual budget and timeline vary based on specific requirements, configurations, and market conditions at the time. This data is for reference only.)

OUR Core Value

For Corporate Clients:

Proof of Capability:

Our product durability meets the world’s most stringent industrial standards.

Our modules are manufactured here.

Shopping cart close

Creative Solutions by Professional Designers

+(86) 152-6248-7692

info@camphortreeprefab.com

Room 212, Bldg 1, 218 Sufu Rd, Suzhou New District,
Suzhou, Jiangsu, China

Main Offices

Mon – Fri: 8am-6pm

Sat -Sun: 9am-5pm

© 2026 Camphortree Prefab . All Rights Reserved.