Industras

Amboseli Eco-Luxury Villas

Amboseli Eco-Luxury Villas

Challenge:

To construct 12 premium suites with minimal environmental impact in a protected area, requiring fast build time and strict eco-certification.

Our ODM Solutions:

We delivered full-cycle ODM services. The design featured lightweight steel frames with local thatch roofs and custom floor-to-ceiling window modules. Fully furnished units were shipped and assembled on-site in 3 weeks, achieving “zero permanent ground footprint”.

Total Project Duration

5–6 months   (Includes 3 months design/production, 2–3 weeks shipping, 3 weeks installation) Recommended Display

Clients

Luxury Safari Camp Operator

Location

Kenya

Category

End-User Projects

Budget

$1.8M – $2.2M

(Note: Actual budget and timeline vary based on specific requirements, configurations, and market conditions at the time. This data is for reference only.)

OUR Core Value

For End-User Clients:

For Dealers:

We possess top-tier ODM capabilities from concept to implementation, poised to become your exclusive product R&D center.

Shopping cart close

Creative Solutions by Professional Designers

+(86) 152-6248-7692

info@camphortreeprefab.com

Room 212, Bldg 1, 218 Sufu Rd, Suzhou New District,
Suzhou, Jiangsu, China

Main Offices

Mon – Fri: 8am-6pm

Sat -Sun: 9am-5pm

© 2026 Camphortree Prefab . All Rights Reserved.