Amboseli Eco-Luxury Holiday Villa
Challenge:
To construct 12 premium holiday villa with minimal environmental impact in a protected area, requiring fast build time and strict eco-certification.
Our ODM Solutions:
We delivered full-cycle ODM services. The design featured lightweight steel frames with local thatch roofs and custom floor-to-ceiling window modules. Fully furnished holiday villa were shipped and assembled on-site in 3 weeks, achieving “zero permanent ground footprint”.
Total Project Duration
5–6 months (Includes 3 months design/production, 2–3 weeks shipping, 3 weeks installation) Recommended Display
Luxury Safari Camp Operator
Location
Kenya
End-User Projects
Budget
$1.8M – $2.2M
(Note: Actual budget and timeline vary based on specific requirements, configurations, and market conditions at the time. This data is for reference only.)

OUR Core Value
For End-User Clients:
- Unique design appeal
- premium eco-quality
- remarkable construction speed
For Dealers:
We possess top-tier ODM capabilities from concept to implementation, poised to become your exclusive product R&D center.